Onlookers lean over wooden barriers to inspect refurbishing efforts being conducted on the city's Municipal Dock on September 20, 1929. Three workers are pictured gazing as what may be a concrete pile being inserted through an opening in the dock. Besides concrete piling to replace wooden piers then in use, a concrete floor and a fire wall were installed. Repairs were estimated at $90,000.